The original boilers were de-commissioned approximately 2 years ago with a temporary boiler installation providing heating to the estate. The de-commissioned boilers are a combination of heating and hot water and remain in circuit but for the hot water only.
A new heating system is being installed to incorporate new gas-fired modular boilers, boiler primary/shunt pumps, duty stand-by heating pumps, secondary circulation pumps, flues, pipework and pressurisation units, controls, ventilation, electrical services and utilities, HWS provisions and a plate heat exchanger.
The works will be based on a conventional ‘design and build’ basis with Invicta being responsible for all design activities and equipment selection, with the exception of boilers and flues.